Home> Company News> HUIWEN Plastic Injection Mold Quick Quotation Method

HUIWEN Plastic Injection Mold Quick Quotation Method

2025,11,04
HUIWEN Plastic Injection Mold Quick Quotation Method
be05911af9af4456acddd7556d5d9e1b_3
Quick Quotation Method for Injection Molds
 
1. Empirical Calculation Method for Plastic Injection Molds
 
1.1 Mold Price = Material Cost + Design Fee + Processing Fee and Profit + VAT + Trial Mold Fee + Packaging and Transportation Fee;
 
1.2 The proportions of each item are usually as follows:
 
※ Material Cost: Materials and standard parts account for 15%-30% of the total mold cost;
 
※ Processing Fee and Profit: 30%-50%;
 
※ Design Fee: 1% of the total mold cost 0%-15%;
 
※Trial molding: For large and medium-sized molds, the percentage can be controlled within 3%; for small precision molds, it can be controlled within 5%.
 
※Packaging and transportation costs: Can be calculated based on actual costs or at 3%.
 
※Value-added tax: 13%.
 
2. Material coefficient method for plastic injection molds
 
※Mold material costs can be calculated based on mold size and material prices.
 
※Mold price = (6~10) * material cost
 
※Forging mold, plastic mold = 6 * material cost
 
※Die casting mold = 10 * material cost 3. Injection Molding Processing Fee Calculation
 
※ Injection Molded Part Cost = Material Cost + Processing Fee + Packaging Fee + Transportation Fee (mainly for the Yangtze River Delta region)
 
※ Material Cost = [(1 + Material Loss) * Product Weight * Batch Size + Machine Adjustment Loss Material Weight + Normal Scrap Rate * Product Weight * Batch Size] * Material Unit Price / Batch Size; where material loss is generally 3%-5%; machine adjustment loss material weight and normal scrap product weight are generally 5000g-15000g per product.
 
※ Processing Fee = (Machine Adjustment Time / Batch Size + Molding Time / Number of Mold Cavities) * Injection Molding Machine Operator Fee
 
Injection Molding Machine Operator Fees are categorized by injection molding machine tonnage (for domestic equipment):
 
Equipment Tonnage (T) Operator Fee (RMB/hour) Equipment Tonnage (T) Operator Fee (RMB/hour)
 
80 35-45 200 110-160
 
100 45-60 250 150-200
 
120 65-85 300 180-220
 
150 80-110 350 200-250
 
180 95-140 400 250-350
 
4. Injection Molded Part Price Calculation
 
※Product Unit Price = Material Price + Processing Fee
※Material Fee = (Actual Weight + Loss) * Material Unit Price
※Processing Fee = Molding Cycle * Unit Price (seconds) ÷ Number of Cavities (i.e., price per piece);
 
FAQ (2)
3.500+ Material Choices Custom Injection Molding
Contact Us

Author:

Mr. Kama Liu

Phone/WhatsApp:

+86 15069372818

Popular Products
You may also like
Related Categories

Email to this supplier

Subject:
Mobile:
Email:
Message:

Your message must be betwwen 20-8000 characters

Contact Us

Author:

Mr. Kama Liu

Phone/WhatsApp:

+86 15069372818

Popular Products

Copyright © 2025 ZIBO HUIWEN NEW MATERIAL CO., LTD All rights reserved. Privacy Policy

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send